Commercial DC Fast Charging

DC Chargers For Fleets
That
Cannot Stop

EVOne surveys your depot, installs the DC chargers under 1 EPC contract and handles the LTA grant paperwork.

LTA Certified Exclusive HiCi Distributor 1000+ Chargers Installed
Free Site Survey

Get Your Depot Scoped In 1 Visit

1 engineer visit to your depot. No cost.

Companies already charging with EVOne

800 Super Business Integrator CCCC CDG Chuan Lim Cnergy DHL DSO Lucky Joint Natural Cool PSA PSA Sembcorp Singapore Airlines SingPost ST Engineering StorHub Union Gas YCH 800 Super Business Integrator CCCC CDG Chuan Lim Cnergy DHL DSO Lucky Joint Natural Cool PSA PSA Sembcorp Singapore Airlines SingPost ST Engineering StorHub Union Gas YCH
Speed
1-4
Weeks from site survey to charging
Reliability
99.5%
Charger uptime, monitored 24/7
Response SLA
1-3-6
1 hr acknowledged, 3 hr diagnosed, 6 hr rectified
1 Partner
Full EPC
Engineering, procurement and construction under 1 contract
Common Pitfalls

4 Common Mistakes In Fleet Charging Projects

Tap a card to see the risk and where EVOne answers it.

Find Out What Your Site Can Support

Get your FREE site survey

Get A Written Proposal After 1 Visit

Get your FREE site survey
How It Works

6 Stages From Site Survey To Go-Live

Tap a charger to drive the vehicle to that stage.

Free Site Survey

Engineers visit your site, check the spare power capacity and draw the charger layout for your bays.

Proposal & Grant

You receive a quotation and engineering review, then EVOne submits the LTA grant application, which takes 2 to 3 weeks.

Grid & Approvals

EVOne coordinates with the utility and secures the regulatory approvals your site needs before any works begin.

Installation

Our Licensed and certified workers carry out the civil works, cabling and infrastructure setup, all under a dedicated EVOne site manager.

Testing & Commissioning

Every charger goes through a full system testing and commissioning by our in-house Equipment Specialist and a training will be conducted prior to handover to client.

24/7 Monitoring

Remote diagnostics watch every charger around the clock: a fault is acknowledged within 1 hour, diagnosed within 3 and rectified within 6.

1 h 3 h 6 h
AcknowledgedDiagnosedRectified

Start With A Clear View Of Your Site

Get your FREE site survey
During Installation

Your Vehicles Still Charge While We Build

Slide the vehicle through the build to see where it charges at each stop.

EVOne charging pointYour depot
Works start at your depot. Your vehicles charge at EVOne's existing charging points at a preferential rate.

Keep Your Routes Running During The Build

Get your FREE site survey
Hardware Options

DC Chargers From 30 kW To 360 kW

HiCi, Singapore sole distributor. EVOne engineers know the hardware inside out and replace faulty parts quickly.

charger image

HiCi 60 kW DC

Charging power60 kW
Best forFast daily charging
Plugs it fitsCCS2, CHAdeMO and Type 2, all in 1 cabinet
How a driver startsCard, app, QR code or plug and charge
Built forOutdoors, rain and dust rated to IP55, up to 50 °C
Warranty and after-salesIncluded, handled locally by EVOne
Rated output60 kW
OutletsCCS2, CHAdeMO and Type 2 in 1 cabinet
Charging modeRFID card, plug and charge, app or QR code. Ethernet, 4G or 3G link
Max current200 A CCS2, 125 A CHAdeMO, 63 A Type 2
ProtectionIP55, IK10. Over and under voltage, over current, over temperature, residual current, surge
ProtocolISO 15118, DIN 70121, CHAdeMO 1.2
Max input current110 A at 400 VAC
Size750 × 690 × 1800 mm
Weight≤ 450 kg
Cable length5 m
Operating range-30 to +50 °C
CertificationIEC 61851-1, 61851-23, 61851-21-2. CE, UL

Find Out Which Charger Fits Your Site

Get your FREE site survey
LTA Heavy Vehicle Charger Grant

LTA Co-Funds Up To 50% Of Each Charger

LTA's published conditions, as listed by EVOne. Advisory comes with the proposal.

Chargers at your site
LTA co-funding for the siteUp to $30,000

Capped at $30,000 per charger, 3 chargers per site, minimum 50 kW DC.

When you can apply

Applications are accepted from 1 Jan 2026 to 31 Dec 2028.

2026You are here: Sep 202620272028
Does my site qualify?

The 4 published conditions for the grant.

1.Confirmed purchase order or deposit receipt for the electric heavy vehicles
2.The charger is at least 50 kW DC
3.Installed at your own business premises
4.The chargers serve heavy vehicle lots
Tick all 4 and see where your site stands.
Meets all 4 conditions

Check Your Eligibility

Get your FREE site survey
Projects And Clients

Depots Already Running On EVOne Chargers

Tap a project to see the site. Figures as published by EVOne.

proof photo 1
proof photo 2
proof photo 3
proof photo 4
proof photo 5
Tower Transit Singapore15 × 120 kW DCBus depot
What clients say
Their ability to deliver large-scale EV charging solutions for our depots has greatly contributed to our sustainability targets. The team’s professionalism and technical expertise ensured a smooth and timely installation.
Mr. TanSustainability Manager, PSA Singapore

Add Your Depot To The List

Get your FREE site survey
Before You Enquire

What Fleet Managers Ask Before A Survey

Pick a question. The charger plugs into it and shows the answer.

Answer1 / 6

The engineer checks 5 things on the visit

  • Spare electrical capacity
  • Whether your main switchboard can take the load
  • Installation space and cable routing
  • Landlord or building owner approval, where applicable
  • The vehicle types you will charge

The assessment sets the most cost-efficient layout before any works begin.

Much more than an AC charger. Indicative draw per unit:

Your incoming supply, transformer capacity and spare load decide what can be installed. If the supply is short, an upgrade is scoped in the proposal.

4 inputs decide it

  • Vehicle battery size
  • Daily mileage
  • Downtime available for charging
  • Your existing power supply

EVOne's engineers recommend the size after the survey.

Yes. Every EV charger in Singapore has to be registered with LTA before it can be used. The charger must be an LTA-approved model, the installation has to be certified fit for use, and a registration mark goes on the unit once it is approved. EVOne takes care of all of this during commissioning.

2 things: a power supply upgrade, or authority approvals that take longer than usual. Both are identified at the survey stage.

No. A confirmed purchase order or deposit receipt for the electric heavy vehicles is enough for the submission.

Request A Quotation For Your Depot

Get your FREE site survey
Next Step

Book Your Free Site Survey

final image

Book Your Appointment Below

No cost. EVOne contacts you to arrange the visit.

Thank you. Your survey request is in. EVOne will contact you to arrange the visit.
Get your FREE site survey