EVOne surveys your depot, installs the DC chargers under 1 EPC contract and handles the LTA grant paperwork.
1 engineer visit to your depot. No cost.
Tap a card to see the risk and where EVOne answers it.
Tap any image to enlarge.
Tap a charger to drive the vehicle to that stage.
Engineers visit your site, check the spare power capacity and draw the charger layout for your bays.
You receive a quotation and engineering review, then EVOne submits the LTA grant application, which takes 2 to 3 weeks.
EVOne coordinates with the utility and secures the regulatory approvals your site needs before any works begin.
Our Licensed and certified workers carry out the civil works, cabling and infrastructure setup, all under a dedicated EVOne site manager.
Every charger goes through a full system testing and commissioning by our in-house Equipment Specialist and a training will be conducted prior to handover to client.
Remote diagnostics watch every charger around the clock: a fault is acknowledged within 1 hour, diagnosed within 3 and rectified within 6.
Slide the vehicle through the build to see where it charges at each stop.
HiCi, Singapore sole distributor. EVOne engineers know the hardware inside out and replace faulty parts quickly.
LTA's published conditions, as listed by EVOne. Advisory comes with the proposal.
Capped at $30,000 per charger, 3 chargers per site, minimum 50 kW DC.
Applications are accepted from 1 Jan 2026 to 31 Dec 2028.
The 4 published conditions for the grant.
Tap a project to see the site. Figures as published by EVOne.





Their ability to deliver large-scale EV charging solutions for our depots has greatly contributed to our sustainability targets. The team’s professionalism and technical expertise ensured a smooth and timely installation.Mr. TanSustainability Manager, PSA Singapore
Pick a question. The charger plugs into it and shows the answer.
The engineer checks 5 things on the visit
The assessment sets the most cost-efficient layout before any works begin.
Much more than an AC charger. Indicative draw per unit:
Your incoming supply, transformer capacity and spare load decide what can be installed. If the supply is short, an upgrade is scoped in the proposal.
4 inputs decide it
EVOne's engineers recommend the size after the survey.
Yes. Every EV charger in Singapore has to be registered with LTA before it can be used. The charger must be an LTA-approved model, the installation has to be certified fit for use, and a registration mark goes on the unit once it is approved. EVOne takes care of all of this during commissioning.
2 things: a power supply upgrade, or authority approvals that take longer than usual. Both are identified at the survey stage.
No. A confirmed purchase order or deposit receipt for the electric heavy vehicles is enough for the submission.
No cost. EVOne contacts you to arrange the visit.
An EVOne engineer visits your depot, checks spare power capacity and returns layout drawings with grant advisory.